1.Close both the isolation valves.
2. Open the vent valve on L.P. leg and H.P. leg drain.
3. Check and adjust zero if necessary.
1.Close both the isolation valves.
2. Open the vent valve on L.P. leg and H.P. leg drain.
3. Check and adjust zero if necessary.